On July 8, the 10th anniversary celebration of Superbtent was held in Superb Technology Plaza. Show the fruitful results achieved in the past ten years, show the spirit of the employees' dedication to the company, further encourage all employees to stay true to their original aspirations and forge ahead, and thank the partners and customers for their strong support over the years. All walks of life gathered at the event site, and nearly 500 people from company leaders, industry pioneers, brand representatives and media witnessed this important moment. At the celebration site, Mr. Zhen Fangkun, chairman of Superpower, delivered a speech for the event. On behalf of the company's management, he expressed his heartfelt thanks to the shareholders, employees and partners who have supported the development of the company for a long time, and proposed that Superb should create more brilliant achievements and write a new brilliant chapter on the basis of the previous ten years . The ten-ye...
2017-09-09
The installation step of two-story tent
Two-story tent is the latest design and research by Superbtent . Product concept originated in Germany.
The double-deck structure consists of two layers, the shape is multiple, such as A frame, arcum, curve , the span size is 10-30m, the main diameter is 300 × 120, double tent was designed durable. The wind speed is 100 km / h, it can bear 500 kg per square meter. double deck tent structure is simple and easy to install.
1. Locate the floor on the ground according the using specification of tent. All floorboards need to be on the same level. Making sure the floor is at the same level, then fixing the floor(such as expandable bolt, ground anchor, weight plate).
2. The Pipe fitting of first floor connected by all parts and placed in the combination of the corresponding components.
3. Upringht support and base plate is connected by pin .Using corner connecter ,middle connecter connect upright support and roof beam and other part. Fixed with studs, and then assembled angle bumper and wire rope and so on
4. With sling mounted on the roof beam, then using Traction equipment (such as cranes, forklifts, etc.) connected safety by traction cable and the inclined beam. Putting the first door frame with a cross bar, with a plug to connect the bottom of the column, the other end of the column to connect the cross column hole fixed, the second door frame as the first door frame.
5.Connecting the beams between the upright support and roof beam, Fixed with bolt, then connecting and tightening all part of wire.
6. Assemble the stairs and the platform, connect to the wall or side wall can also be inside to the stairs, free to choose the stairs location.
7. Assemble the first floor’s wooden floor, choosing a file around the corner of the wood floor to installation, The standard is installed according to the first floor of the wood floor.
8. Assemble the second floor aluminium frame: Can be assembled on the first floor platform or assembled on the ground with a crane hoisting
9. As the aluminium frame of first floor, hanging from the fixed column and the bottom plate, with cross bar fixed from the second door frame, with beams, purlins connected to the corresponding position, tighten the wire rope.
10. The two-layer brackets are tightened
11. Function configuration: such as by a layer of two fence, assembly glass wall, ABS wall, glass door, sliding door, electric sensor door, electric roll gate, all transparent tarpaulin, curtain and closed curtain flat pull ceilings, cloth Flag, folds.